• Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
  • Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
  • Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
  • Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
  • Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
  • Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

After-sales Service: 5 Years
Warranty: 5 Years
Certification: ISO 9001:2008
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling pictures & photos
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
US $192,000-320,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Product Size
  • Product Photos
  • FAQ
  • Packaging & Shipping
  • Company Profile
Overview

Basic Info.

Model NO.
DL2-hs
Condition
New
Motor
AC Motor
Drill Hole Diameter
<100mm
Drill Hole Depth
<100m
Bit Type
Diamond Bit
Drilling Way
Impactor
Model
Dl2-HS
Weight
13500kg
Certificate
Fops/Rops
Working Area
3.2mx4m
Application
Long Hole for Underground Mine and Tunnels
Rock Drill
1838,25u
Pressure
8 Bar
Ground Clearance
238mm
Drill Rod Length
915/1220mm
Hole Depth
26/34.8m
Hole Diameter
64-89mm
Main Motors Power
75kw
Walking Speed
7km/H
Production Time
50-80 Days
Delivery Time
30-60 Days
Transport Package
FCL and Wooden Cardboard Packaging
Specification
10121*2050*2825mm
Trademark
Siton
Origin
China
HS Code
8430503900
Production Capacity
800PCS/ Year

Packaging & Delivery

Package Size
900.00cm * 160.00cm * 300.00cm
Package Gross Weight
13500.000kg

Product Description


 

Product Description

DL2-hs hydraulic mining drilling rig is a special type of deep hole rock drilling equipment designed for roadways of 3.2-4m. The mining production drill rigs can walk and transition flexibly in small lanes. The design of the large rod handling system containing 27+1 pieces of rods can realize automatic loading and unloading rods in small lanes. For deep hole drilling operations in underground mine projects, DL2-hs deep hole drilling rigs can meet with the requirements of vertical, fan-shaped and parallel long hole drilling construction. The deep hole mining jumbo adopts to full hydraulic drive rock drilling. The drilling depth can reach more than 30 meters once a time.

Features:
1.Woserld Rock Drill
Adopted Woserld 18KW hydraulic rock drill, the rock drilling speed is fast and economical, up to 0.5-2 m/min. Per the rock drilling requirement, multiple solution can be chosen. 18kw rock drill is standard, and higher power 25kw rock drill is optional.
With the classic double damping design, the service life is long and the cost is low.

2.Horseshoe Type Frame Boom Support
The design of the horseshoe type frame ensures the precise positioning and stable support of the advancing feed thus it makes sure high-quality drilling.

3.Large Rod Handling System
It can contain 27+1 pieces of rods and meet with automatic loading rods to drill holes one-time completion.

4.Hydraulic and Protection System
Adopted the international brand plunger pump hydraulic control system to directly control the rock drilling system, with reliable quality and long service life. Designed with safety alarm protections such as low fuel oil level, high water temperature, high hydraulic oil temperature, etc.

5.FOPS Safety Cab
The ceiling meets with the FOPS standard (falling object protective structures). Adopted hydraulic lifting control, and is equipped with comfortable driving seats.
 

Product Parameters

Model No. DL2-Nb DL2 DL2-hs DL3-b
Main Information
Dimension (mm*mm*mm) 8195X1390X (1880/2580) (7006/7783) X1600X (2080/2780) 8430X1600X2913 10121X2050X2815
Weight (KG) 9000 11500 13500 15600
Turning Radius (mm) 2463/5072 2805/4841 3341/5811 3315/6106
Working Area (m*m) 2.8X2.8-4.3X4.3 3X3-4.5X4.3 4X5.5 (Max) 3.5X3.5-5X5
Feed
Drill Rod Length (mm) 915/1220/1525 1220/1525 915/1220 915/1220/1525/1830
Hole Diameter (mm) φ64-89 φ64-89 φ64-89 φ64-76
Hole Depth (mm) 1500/1900/2500 1330/1550/1810/1960 2600/3480 1300/1630/1970/2300
Electrical System
Main Motors Power (KW) 55 55 75 75
Voltage (V) Customized Customized Customized Customized
Electrical Cable Volume (m) 55 80 70 90
Hydraulic System
Max. System Pressure (Bar) 230 230 230 230
Filtration Accuracy (μm) 10 10 10 10
Chassis
Engine Rated Power (KW) 58 56.5 54 /
Walking Speed (Km/h) 8 10 7 14
Climbing Ability (degree °) 14 14 14 14
Rock Drill
Model WOSERLD A18D/L WOSERLD A18D/L, A25L WOSERLD A18D/L, A25L WOSERLD A18D/L, A25L
Shank T38 T38/T45/T51 T38/T45/T51 T38/T45/T51
Drilling Diameter (mm) 33-76 33-115 64-115 64-115
Max. Impact power (KW) 18 18/25 18/25 18/25
Impact Frequency (HZ) 60 44/60 44/60 44/60
If you have other custom requirements, you can contact us at any time.
 

Product Size

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

If you want to know more product size, please contact us at any time.  
 

Product Photos

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling


Details
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for TunnelingDl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

 

FAQ

Q: Are you a trading company or a manufacturer?
A: We are a professional manufacturer with independent research and development, production and manufacturing capabilities for 30 years.

Q: What is your guarantee for quality?
A: We have 5 years warranty and will take responsibility for our quality.


Q: How about your delivery time?
A: Generally, it will take about 30-45 days. The specific delivery time depends on the items and the quantity of your order.


Q: What is your payment terms?
A: We accept T/T in advance. Then Western Union, PayPal or L/C.

Q: What is your usual port?
A: Shanghai or Shenzhen.


Q: What is your shipment?
A: 1) By our forwarding agent, you can choose by Sea (Container &LCL),by Train, by Truck.

2)By your own forwarding agent.
3)By domestic forwarding agents to any city in China.

PS: lf you have any questions about us, please contact with me quickly.

Packaging & Shipping

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

Company Profile

Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling

Our Customer
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
Exhibition
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling pictures & photos
Dl2-HS Drilling/Petroleum Equipment Factory Deep Hole Drilling Rig for Tunneling
US $192,000-320,000 / Piece
Min. Order: 1 Piece
Gold Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Type of Ownership
Limited Company
Management System Certification
ISO9001:2015, ISO14001:2015, ISO45001:2018