• Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
  • Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
  • Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
  • Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
  • Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
  • Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders

Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders

After-sales Service: 5 Years
Warranty: 5 Years
Whole Weight: 19200 Kgs: Dimension: 9200*2100*2390mm
Power: Electrical, Diesel for Traveling: Traveliing: Crawler
Loading Ability: 180 M3/H: Max Working Gradient: 15 Degrees
Power: 75 Kw: Excavating Coverage: Min 15 M2
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
LWL-180
Scraper Chain System: Iron Steel
Oil Tank: 400 L
Type
Excavating Machinery
Mining Object
Metallic and Non-Metallic Ore Excavator
Transport Package
Nude Packing
Specification
ISO9001
Trademark
Siton
Origin
China
HS Code
8429590000
Production Capacity
30 Sets/ Month

Product Description

Range of application

The mucking loader is mainly used in coal mines, metal mines, hydropower tunnels and other underground projects. The company has developed different kinds of loaders many times and
Updated them to adapt to different working conditions including section from2.0 X 2.0 m to
9 X 9 m (Height X Width), slope within 33 degrees.

Main characteristics
1. The mucking loader adopts Electrohydraulic control system with reduced-voltage startSuitable for long tunnel projects.
2. Main movements controlled by pilot valves, Easily operated and stable.
3. 30% of the configurations are imported. Oil will be Multistep filtered. With air cooling radiator.
4. Load rocks completely without labor work.
5. Convey rocks with chain -scraper, stable and high efficiency.
6. Semi-enclosed assembling, easy to maintain.
Mine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock LoadersMine Tunnel Excavator (LWL-180) Mucking Rock Loaders
 
Main Overall Dimension LWL-180/79L
Crawler contacting ground length 2159 mm
Crawler inner width 1130 mm (variable)
Crawler plate width 450/550 mm
Ground clearance 395   mm (variable)
Conveyor inner width 780   mm
Dimensions during transport Length 9400 mm
Width 2100 mm
Height 2390 mm
Dimensions during operating Length 11500 mm
Width 2100 mm
Height 2514 mm
 
Working Range
 
  Item LWL-180/79L
A Digging width 7030 mm
B Digging distance(from dozer blade) 3260 mm
C Digging height 4635 mm
D Digging depth below ground level 990 mm
E Dumping height 2000 mm (variable)
F Minimum dumping height 1680 mm (variable)
G Dumping distance 2680 mm (variable)
H Max. boom angle ±55°
  Adaptive tunnel dimension
(Width × Height)
≥3.8×3.8 m
 
Functional Parameters
  LWL-180/79L
Loading ability 180 m3/h
General power 79 kw
Weight 19200 kg
Traveling speed 0.6±5% m/s
Scraper chain Double chains double motors
/Single chain double motors
Adaptive tunnel slope ≤15°
Minimum turning radius ≥8m
Ground pressure ≤0.1 Mpa
Steering Hydraulic
Speed of scraper chain 44m/min
Volume of hydraulic tank 400L
Maximum working pressure 28 Mpa
Hydraulic pump Plunger pump×2 + gear pump×2
walking hydraulic motor Radial plunger motor×2
Conveyor hydraulic motor Radial plunger motor×2

Company Profile
Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
Shipment
Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
Our Customer
Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders
Exhibition
Mine Tunnel Excavator (LWL-180) Mucking Rock Loaders




FAQ

1. Will necessary spare parts be offered in time?
Normally we suggest customers to buy spare parts for at least 2 years of operation once they buy a new equipment. We will also deliver enough spare parts to our distributor in some countries.

2. How to solve the unusual faults during operation?
SITON will give prompt reply on how to repair the equipments within 24 hours once we receive the fault report. We can also send engineers to the site if necessary.

3. Does SITON offer training for operating and maintenance?
Customers can send their engineers to SITON for one week training and necessary accommodation will be offered free of charge. We will send engineers to the site for technical support if customers requires.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now